The maximum authorization period for the operation of the Angra 3 nuclear thermoelectric plant is 50 years, with possible extension for up to 20 years

AnswerThe authorization for the operation of the Angra 3 nuclear thermoelectric plant has a maximum term of 50 years, which can be extended for up to 20 years.

Reviewed on 2026-10-04 · next review 2027-04-04

Data

WhoMaximum termExtension conditionSourceData source
CNPE50 yearsExtension for up to 20 yearsLaw 14.120/2021, art. 10, § 1º, item I01/03/2021

Data consulted on 04/10/2026.

Basis

How it applies

The authorization for the operation of the Angra 3 nuclear thermoelectric plant is granted by the National Energy Policy Council (CNPE) and has an initial term of 50 years. This term can be extended by up to 20 additional years, provided the conditions established in the Aneel regulations and the energy supply contract are met.

Limits